S-07
Declassified
S-07 enters low-rate production
First batch of twelve airframes leaves the line after 412 test sorties without a loss.
After eighteen months of flight test, S-07 has been cleared for low-rate initial production. The first batch of twelve airframes is scheduled for delivery in the second quarter.
Every airframe ships with Sawtooth Ops and a ground crew of two. No pilot, no cockpit, no compromise on signature.
The full file is need-to-know.
Request a briefing under NDA.